The Upgrade of the Full-Scale IREN RF Stand Control System Software

Ju. Boecher, A.S. Kayukov, M.M. Korjevkina

Joint Institute for Nuclear Research, Dubna, Russia

The out-of-date approach to automation of physical installations is considered by the example of the old RF stand control system. Transition to new design of control is proved on the basis of the distributed systems. Conversion to new system on basis of LabView is carried out, trial starts and debugging are made. The structure and functioning of the updated system is shown. Prospects of construction of similar control systems are considered in the field of their applicability.

[1]A. Novokhatsky et.al.,”Linear Accelerator for Intense Resonance Neutron Source (IREN), in Proceedings of the 2nd Workshop on JINR Tau-Charm Factory, p.197,D1,9,13-93-459, Dubna, 1994.
[2]A. Kaminsky, et al., "LUE200 - Driver Linac For Intense Resonant Neutron Spectrometer (IREN)", Proceedings of LINAC96 Conference. Geneva, August 26-30, 1996, pp. 508-510. CERN (1996).