04-4-1105-2011/2019
Priority:1
Status: Being concluded

Development of the IBR-2 Facility with a Complex of Cryogenic Neutron Moderators


Leaders:     A.V. Belushkin
A.V. Vinogradov

Participating countries and international organizations:
Argentina, Azerbaijan, Belarus, Japan, Mongolia, Poland, Romania, Russia, United Kingdom, USA.

Issues addressed and main goals of research:
The theme main task of the theme is to increase the efficiency of the use of the IBR-2 facility for realization of the program of experimental investigations, maintenance of operational reliability and safety of the reactor, creation of a complex of cryogenic neutron moderators.

Expected major results in the current year:
  • Maintenance of the IBR-2 reactor operation for physical investigations.

  • Assembling of a reserve movable reflector MR-3R at FLPN test bench.

  • Putting into test operation of the CM-201 cryogenic moderator equipment at a working place.

  • Step-by-step replacement and upgrading of the technological and electrical equipment in accordance with the Rostekhnadzor license requirements.

List of projects:
  Project Leader Priority
(period of realisation)
1. Construction of a Complex
of Cryogenic Moderators
at the IBR-2 Facility
A.A. Belyakov 1   (2014-2019)

List of Activities
  Activity or Experiment Leaders
Status
  Laboratory or other
Division of JINR
Responsible person
Main researchers
1. Operation of the IBR-2 facility
in the regular mode
A.V. Dolgikh
A.V. Vinogradov
Realization
  FLNP M.V. Andrianov, A.A. Belyakov, Yu.N. Pepelyshev, S.V. Rudenko, S.A. Tsarenkov, V.A. Trepalin + 30 engineers, + 50 workers
2. Maintenance of program
of physical investigations
A.V. Vinogradov
A.V. Dolgikh
Realization
  FLNP A.A. Belyakov, Yu.N. Pepelyshev, S.V. Rudenko, V.A. Trepalin + 30 engineers, + 50 workers
3. Installation and adjustment of
equipment and pipelines of CM-201
cryogenic moderator at test bench.
Test operation of equipment of
CM-202 and CM-201 cryogenic
moderators using a new cryogenic
facility by "Linde"
A.A. Belyakov
K.A. Mukhin
Realization
  FLNP S.A. Kulikov, E.P. Shabalin + 15 engineers, + 15 workers
4. Assembling of reserve movable
reflector MR-3R
A.V. Vinogradov
A.V. Dolgikh
Realization
  FLNP A.A. Belyakov + 5 engineers, + 5 workers
5. Step-by-step replacement and
upgrade of basic technological
and electrical equipment
A.V. Vinogradov
A.V. Dolgikh
Realization
  FLNP A.A. Belyakov, A.V. Trepalin + 30 engineers, + 50 workers

Collaboration
Country or International
Organization
City Institute or Laboratory
Argentina Buenos Aires CNEA
Azerbaijan Baku IRP ANAS
NNRC
Belarus Minsk JIPNR-Sosny NASB
Japan Osaka ISIR
Sapporo Hokkaido Univ.
Mongolia Ulaanbaatar IPT MAS
Poland Krakow AGH-UST
Romania Bucharest IFIN-HH
Russia Moscow NIKIET
Geliymash
INEUM
SYSTEMATOM
SSDI
ENES
United Kingdom Didcot RAL
USA Indianapolis, IN IUPUI