Next themePrev. theme
to field of reseachto contents

04-4-1105-2011/2019
Priority:1
Status: Extended

Development of the IBR-2 Facility with a Complex of Cryogenic Neutron Moderators


Leaders:     A.V. Belushkin
A.V. Vinogradov

Participating Countries and International Organizations:
Argentina, Azerbaijan, Belarus, Czech Republic, Japan, Mongolia, Poland, Romania, Russia, Spain, United Kingdom, USA.

Scientific Programme:
The theme main task is to increase the efficiency of the use of the IBR-2 facility for realization of the program of experimental investigations, maintenance of operational reliability and safety of the reactor,
creation of a complex of cryogenic neutron moderators.

Expected main results in 2017:
  • Maintenance of the IBR-2 reactor operation for physical investigations.

  • Manufacturing of a reserve movable reflector MR-3R (with the extension of work through 2018).

  • Carrying out of experiments, development and construction of new units and equipment, optimization of operating modes on the test stand of the CM-201 cryogenic moderator.

  • Step-by-step replacement and upgrading of the technological and electrical equipment in accordance with the Rostechnadzor license requirements.

List of projects:
  Project Leader Priority
(period of realisation)
1. Construction of a Complex
of Cryogenic Moderators
at the IBR-2 Facility
A.A. Belyakov 1   (2014-2019)

List of Activities
  Activity or Experiment Leaders
Status
  Laboratory or other
Division of JINR
Responsible person
Main researchers
1. Operation of the IBR-2 facility in
the regular mode
A.V. Dolgikh
A.V. Vinogradov
Realization
  FLNP A.A. Belyakov, S.A. Tsarenkov, V.G. Ermilov, S.V. Rudenko, Yu.N. Pepelyshev, V.A. Trepalin, + 30 engineers, + 50 workers
2. Maintenance of the program of
physical investigations
V.D. Ananiev
A.V. Vinogradov
A.V. Dolgikh
Realization
  FLNP A.A. Belyakov, Yu.N. Pepelyshev, V.A. Trepalin, S.V. Rudenko, + 30 engineers, + 50 workers
3. Experiments on a test stand
of the CM-201 cryogenic
moderator. Manufacturing and
installation of equipment
and pipelines of the CM-201
cryogenic moderator (with
the extension of work to 2018).
Feasibility study of the cryogenic
moderator CM-203.
Mastering of the equipment of
cryogenic moderators
using a new cryogenic facility by
"Linde" in its regular place
A.A. Belyakov
K.A. Mukhin
Realization
  FLNP V.D. Ananiev, S.A. Kulikov, E.P. Shabalin, + 15 engineers, + 15 workers
4. Manufacturing of a reserve
movable reflector MR-3R
A.V. Vinogradov
A.V. Dolgikh
Realization
  FLNP A.A. Belyakov, V.D. Ananiev, + 5 engineers, + 5 workers
5. Step-by-step replacement
and upgrade of basic technological
and electrical equipment
A.V. Vinogradov
A.V. Dolgikh
Realization
  FLNP A.A. Belyakov, A.V. Trepalin, + 30 engineers,
+ 50 workers

Collaboration
Country or International
Organization
City Institute or Laboratory
Argentina Buenos Aires CNEA
Azerbaijan Baku IRP ANAS
NNRC
Belarus Minsk IAP NASB
Czech Republic Rez UJV
Plzen "Skoda"
Japan Sapporo Hokkaido Univ.
Osaka ISIR
Mongolia Ulaanbaatar MUST
Poland Krakow AGH-UST
Romania Bucharest IFIN-HH
Russia Moscow NIKIET
Geliymash
INEUM
SYSTEMATOM
SSDI
ENES
Profimontazhservis
Spain Valencia UPV
United Kingdom Didcot RAL
USA Indianapolis, IN IUPUI

Next themePrev. theme
to field of reseachto contents